TEXAS A&M REPLACEMENT BOILER

Client

Texas A&M University

Date

2004

Category

Prime Contractor

This project required the replacement of three existing HW Boilers with three new owner-furnished boilers. The existing boilers were removed from service and handed over to the Owner for re-use. Additional associated work included the fabrication and installation of a 14” boiler main, 10” and 8” boiler piping installation, combustion air and new flue piping for the new boilers, electrical installation, roofing work, concrete work, insulation, and industrial grade instrumentation installation.

MPS was the prime contractor on this project and subcontracted out the electrical, roofing, concrete, and insulation scopes of this project.